Production

The activities we develop as well as our manufacturing facilities are located in Piatra Neamt, spanning on an area of 165,000 sqm which includes administrative buildings, warehouses and working platforms and involves multiple departments.5

4The investments of over 1 million targeted the modernization of warehouses, working halls, buildings and refurbishment of the production line.

The welding shop has been completely modernized and equipped with welding booths and welding work equipment from the newest generation. With the new equipments now we can achieve pulsed arc welding, and the results in terms of quality are significantly better for all work performed.

To extend the life of every equipment we produce, we have included in the modernization plan, the refurbishment of painting workshop which is completely rebuilt. The pickling installation that we use today is new and works to the highest standards, which is reflected in the performance of agricultural machinery that we produce: 6 all parts are subjected to this process, which enables the elimination of all traces of rust and ensures a longer life of the equipment. The painting is done with powder in electrostatic field with polymerisation in gas ovens.

7Assembly speed and accuracy have a direct impact on productivity and quality of equipments, which is why the assembly workshop was also on our list of priorities. In
2014 this workshop was completely modernized and equipped with two assembly lines. Each of them is adapted to assemble different types of machines and designed to follow an effective technology route.

8

TOP